Your current browser version is too low, in order to bring you a better browsing effect, please use a higher version browser

Home Service Installation

Contact Us

Installation

1、LF Group provides two installation methods for you to choose.
Supervision:
According to the project quantity and complexity, 1-3 engineers who have rich experience in installation will be sent for erection guidance. 
Erection team (Optioned)

 space frame engineering installation

2、LF is the most professional space frame manufacturer in China and has rich experience in space frame design, production, manufacturing, installation and other aspects, LF’s large steel space frame structure is widely used in airport terminals, industrial warehouses, stadiums roof, and other large-span, large-bay buildings.LF project team to help customers to space frame installation, According to the basic conditions of the space truss project, the required installation method will be analyzed. The common construction methods are a high-altitude bulk method, high-altitude sliding method, integral lifting method, integral jacking method, etc.