(1)Project Location: Harare, Zimbabwe;
(2)Completion date: October 2022;
(3)The Harare wide-span space frame steel structure drug warehouse building project is located in the south of Harare Central Hospital, covering an area of about 43,000 square meters, with a total construction area of about 13,700 square meters;
(4)The structure is a flat space frame, light steel arch roof structure with multi-point support (column cap);
(5)The project mainly includes 2 galvanized steel warehouses and supporting facilities. Warehouse No. 1 meets the storage standards for COVID-19 vaccines, and prefabricated warehouse No. 2 is a room-temperature warehouse for dangerous goods, becoming the largest drug storage and transportation center in Zimbabwe.