The project contracted by LF Group– 2×150MW Coal Storage Shed of the Calaca Power Plant in the Philippines.Main structure manufacturer and installation was started in 2013.In order to ensure the period task completed as scheduled,LF project department has formulated a detailed timetable and construction plan, carefully organized the construction, strictly controlled the safety and quality, and focused on strengthening the management of technical design, program development and on-site construction.