The Sports Stadium project covers an area of 8,289m², with a total construction area of about 18,620m².
Large steel structure warehouse building structure arrangement, mainly consider the arrangement of the frame and the vertical support system arrangement, and to form a stable structure system, choosing the reasonable support form and arrangement, can be on the premise of safe and reliable guarantee steel structure factory building use function, extend the service life of it, given that technical personnel on the deliberate choice.
Dhaka International airport terminal building project in Bangladesh has a total steel volume of 20,000 tons.
The architectural image of the civic center is like a Dapeng spreading its wings (see Figure 1), with a grand spirit. The total construction area of the steel structure project is about 210,000 m², the steel roof structure has an area of 91,000 m², and has a total height of about 80m. 12 and 15 layers.
A shopping center has 2 skylight roof glass domes, one is a dome skylight with a span of 30.8m, the other is an oval skylight, its long axis is 32m, and its short axis is 22.6m.
The steel structure is widely used in industrial buildings. Steel structure warehouse means that the main load-bearing components are composed of steel.
The Football Stadium (Figure 1) has a total construction area of 52,795m2, and the number of spectator seats is 34,318 (including 30,694 fixed stands and 3,624 active stands).
The closed structure part of the large prefab metal shed mainly includes the space frames roof, the reinforced concrete coal retaining wall, the trestle entering the warehouse and the tunnel exiting the warehouse.
The roof structure of an aircraft maintenance hangar project is three sides supporting and one side opening (hangar gate), and the gate truss is set on the opening side.
With the continuous improvement of the design, manufacture, and construction technology of the large-span dome space frame storage shed, the cost is continuously reduced, and the domestic and foreign requirements for environmental protection are getting higher and higher. more,
The museum consists of two parts, with a total construction area of 40,987m² and a building height of 35m. The three glass dome skylights are located in three areas A, B, and C of the roof, which is irregular ellipsoid hyperboloid structures.
The flat space frame belongs to the space member system, so there are many members on the nodes.