The roof structure of an aircraft maintenance hangar project is three sides supporting and one side opening (hangar gate), and the gate truss is set on the opening side.
With the continuous improvement of the design, manufacture, and construction technology of the large-span dome space frame storage shed, the cost is continuously reduced, and the domestic and foreign requirements for environmental protection are getting higher and higher. more,
The museum consists of two parts, with a total construction area of 40,987m² and a building height of 35m. The three glass dome skylights are located in three areas A, B, and C of the roof, which is irregular ellipsoid hyperboloid structures.
The flat space frame belongs to the space member system, so there are many members on the nodes.
Talatona Church building project with a total construction area of 14,150 square meters, a total of four floors. There are three floors above ground and one underground.
The shopping mall center consists of three building units: Supermarket in Area A, Shopping Center in Area B, and Shopping Center in Area C.
In order to ensure that the space frame construction is correct, pre-assembly should be carried out. During pre-assembly, the site should be leveled and compacted, and the stake should be accurately set out (a shelf platform should be set up for high-altitude assembly, and the stake should be set out on the platform).
The selection of the space frame structure is based on the plane shape of the building, the span size, the support situation, the load size, the roof structure, the building requirements, the manufacturing and installation methods, and the material supply situation, combined with the principles of applicability and economy.
The steel structure gymnasium has a novel and unique shape, and the overall appearance is a giant "battleship".
In steel structure buildings, there are mainly three protection methods: fireproof coating method, spraying fireproof coating, and water filling method.
Until recently, Qingdao Jiaodong International Airport's terminal building project has been fully completed.
The upper space frame of Hebei Olympic Sports Center Gymnasium is a peripheral supporting plane space frame.