Your current browser version is too low, in order to bring you a better browsing effect, please use a higher version browser
HOME
PRODUCTS
SOLUTION
NEWS
WHY US
SERVICE
ABOUT US
CONTACT
At the beginning of the 20th century, the importance of industrial architecture became increasingly prominent, and the design practice of industrial architecture became the core of modern architectural thought theory.
This project is the hydraulic lifting project of the roof steel structure of the first exhibition hall, the second exhibition hall, and the third exhibition hall of Zhejiang Hengdian International Convention and Exhibition Center.
The Taizhou Municipal Office Building has a total construction area of 48,000 m, with 1 underground floor and 12 above-ground floors.
Ethiopian Airlines B747 maintenance hangar is one of the largest and most advanced aircraft maintenance hangars in Africa.
In order to generate electricity safely, thermal power plants generally need to store a certain amount of coal in the plant and set up a mechanized coal storage yard.
In recent years, with the rapid development of the biomass power generation industry, the design concept of biomass power plant combustion raw material storage site is constantly updated and changed.
The AU conference center project is located in Addis Ababa, the capital of Ethiopia.
A flat steel space frame is a better structural type of space steel structure.
The total construction area of the stadium roof project is about 82353.3m².
The International Exhibition Hall project consists of five functional areas: conference and exhibition, covered property, roof garden, underground shopping mall, underground garage, and computer room.
Tanfang Railway Station has a total construction area of 25495.94m². The roof adopts a large-span space frame structure, with four-angle cone bolt-ball joints (partially welded balls) in place.
The pavilion of the Youth Activity Center is 50m long from north to south and 67.8m long from east to west. There are a 28mx15m dolphin performance pool and three temporary dolphin feeding pools.
marketing01@cnxzlf.com
+86-516-8595-0258
+86 17751936871