Your current browser version is too low, in order to bring you a better browsing effect, please use a higher version browser
HOME
PRODUCTS
SOLUTION
NEWS
WHY US
SERVICE
ABOUT US
CONTACT
The total construction area of the stadium roof project is about 82353.3m².
The International Exhibition Hall project consists of five functional areas: conference and exhibition, covered property, roof garden, underground shopping mall, underground garage, and computer room.
Tanfang Railway Station has a total construction area of 25495.94m². The roof adopts a large-span space frame structure, with four-angle cone bolt-ball joints (partially welded balls) in place.
The pavilion of the Youth Activity Center is 50m long from north to south and 67.8m long from east to west. There are a 28mx15m dolphin performance pool and three temporary dolphin feeding pools.
The space frame structure has the characteristics of a large span and good integrity, so it has been widely used in large-span workshops, especially in airport hangars.
The total construction area of the steel structure stadium is about 48,000 m², the building plane size is about 205m×227m, and the maximum height of the stadium canopy is about 32m.
The large span roof of Egret Stadium is supported by two giant arches in the middle, a concrete structure of a fixed grandstand, and a tall platform of 8.250m.
The competition hall is a circular dome steel structure with a diameter of 116m and a height of 33.3m.
The total construction area of the Galaxy SOHO project is about 219,387m; The main body of the building adopts a reinforced concrete frame structure, with a height of 67.5m, 15 floors above ground, and 3 floors underground.
The coal conveyance belt spans a long route, and the amount of steel used in the trestle is large, so the amount of steel used in the trestle becomes the main index of steel used in the workshop.
Prefab workshop construction is increasingly using space frame structures, the space frame structure is one of the spatial structures.
The appearance of the steel stadium as a whole is a giant "battleship", modeling is novel and unique, The building is high in the south and low in the north and sets matches, training, performance, and other functions.
marketing01@cnxzlf.com
+86-516-8595-0258
+86 17751936871