Your current browser version is too low, in order to bring you a better browsing effect, please use a higher version browser
HOME
PRODUCTS
SOLUTION
NEWS
WHY US
SERVICE
ABOUT US
CONTACT
A shopping center has a total construction area of 280,000 m², of which the above-ground construction area is 150,000 m² and the underground construction area is 130,000 m². Including the big business and Jin Street, the entire site has two basements.
There are various construction techniques for building roofs, and the effects presented by different construction methods also have certain differences.
Membrane structure products have been widely promoted and applied as new materials and new buildings.
The space frame project of Guangzhou Honda Automobile Co., Ltd. has a plane size of about 3000m and a height of 1.96m.
The reconstruction and expansion project of a civil airport mainly includes the new terminal building and the air traffic control building project.
A steel structure is a structure composed of steel materials and is one of the main types of building structures. After the 2008 Olympic Games, my country's steel structure buildings developed rapidly.
The pipe truss of this project is an inverted triangle with a span of 72m, a mid-span belly height of 4.5m, a top chord width of 3m, the top chord pipe is 4203×12 seamless steel pipe, the bottom chord is $377×10 seamless steel pipe, and the web rod is p114×5, 4140 × 6, 4159 × 6, 4159 × 8 steel pipes, all of which are Q355B.
The toll station is no longer just a place for toll collectors to work, With the modernization of the expressway, the toll station has also been given more modern meanings and has become one of the architectural symbols of the city
The large space special-shaped space frame hybrid structure is a hybrid structure system composed of different material structure systems.
One of the most splendid designs of the entire West Railway Station hub station building is the "cloud waiting hall": natural light is introduced into the station building through cross skylights.
The total construction area of the swimming pool project on the Zijingang Campus of Zhejiang University is 12500 m², including 10400.5 m² above ground and 2099.5 m² underground.
The architecture of our country has had its distinctive features since ancient times and is famous all over the world.
marketing01@cnxzlf.com
+86-516-8595-0258
+86 17751936871