Your current browser version is too low, in order to bring you a better browsing effect, please use a higher version browser
HOME
PRODUCTS
SOLUTION
NEWS
WHY US
SERVICE
ABOUT US
CONTACT
The steel space frame structure is a new type of structure that has been widely promoted and used in the past ten years. It is composed of bolt ball joints and steel pipe members and is a super statically indeterminate structure connected by high-strength bolts or welds. It has low steel consumption.
The membrane structure of the sports stadium stand is like the membrane structure in other public places. It generally adopts a modern construction method, combining beautiful curve shapes with smooth construction techniques, so that the venue can still maintain a sense of space in the case of insufficient space.
A museum project refers to the form of the Louvre in Paris. A hemispherical entrance is set in the sunken square. There are 4 floors underground, with a total construction area of 17,874m².
The space frame roof hoisting sequence of this project is as follows: Area 9-1 → Area 10-1 → Area 1 → Area 8 → Area 2 → Area 7 → Area 3 → Area 6 → Area 4 → Area 5 → Area 11-1 → 12 -1 area, the space frame assembly sequence is the same as the hoisting sequence, and the hoisting does not affect the normal construction of the assembly.
The hangar of an engineering aircraft maintenance center is a maintenance hangar that can accommodate two B737-600 aircraft at the same time.
In recent years, there are more and more large-space and long-span steel structure production workshops, commercial shopping malls, gymnasium roof, terminal buildings, warehousing and logistics warehouses.
The National Fitness Activity Center mainly includes "two gymnasiums and two games" including gymnasiums, swimming pools, stadiums, and outdoor activity venues.
The Taizhong Rail Transit Laboratory project is divided into three parts: the experimental area, the enterprise exhibition hall, and the square.
The support system is to directly transmits various loads borne by the glass surface to the main structure of the building, so it is the main force-bearing member, and the structural form and material are generally selected according to the building shape and the load it bears.
A large-span assembly plant building covers an area of 20,976m, with a total construction area of 26,966m.
The existing structure of a stone warehouse is a two-story building with a length of 79.2m, a width of 29.4m, a total height of 10.82m, and a total construction area of 4864.5m².
The total construction area of the Hangzhou mosque dome is 16375m². The building is an attached main building with the worship hall as the core and main body.
marketing01@cnxzlf.com
+86-516-8595-0258
+86 17751936871