Your current browser version is too low, in order to bring you a better browsing effect, please use a higher version browser
HOME
PRODUCTS
SOLUTION
NEWS
WHY US
SERVICE
ABOUT US
CONTACT
Improve the manufacturing precision and installation accuracy of fire-fighting pipelines, and reduce the assembly stress generated during the installation of fire-fighting pipelines. The installation of fire-fighting pipelines is carried out together with the installation of the space frame, forming a flow construction of "first complete the assembly of the lower strings of the space frame, then install the fire-fighting pipelines, and then assemble the upper strings of the space frame", which solves the problem of the difficulty of interspersed installation of fire-fighting pipes in the space frame, and In the flowing water construction, the fire-fighting pipeline is intersected with the air duct and hydropower construction, which is convenient for pipeline adjustment and maintenance.
With the reform and opening up and economic development, steel structure engineering is gradually developing from industrial buildings with high requirements such as large spans, high-rises, and heat resistance to civil buildings.
space frame structure is a commonly used structural form in the construction of large-span buildings today. The selection of different construction methods has different impacts on the construction management objectives of construction projects. In the construction practice of the gymnasium roof space frame structure, comprehensive consideration should be given to various factors to select the applicable space frame structure construction method to ensure the safe and orderly construction.
The space frame structure has been widely promoted in public buildings such as stadiums, airports, and exhibition centers. Its structural form and construction technology continue to become more and more complex. For gymnasium buildings, most of the roof forms are closed structures with a large span.
The same weld should be welded continuously at one time, if it cannot be completed at one time, it should be preheated before welding.
In recent years, long-span structures have been widely used not only in sports buildings, but also in various commercial buildings (such as supermarkets, warehouses and warehouses), and the application of long-span structures in building structures in China is also increasing.
The construction method of the space frame has full scaffolding aerial bulk method, aerial picking method, ground assembly overall lifting method, etc.. Construction methods are diverse and flexible:one construction method can be used alone, or a variety of construction methods can be mixed, and the environmental requirements for the construction site are not too high. Most of the steel structures are prefabricated in factories, assembled on site, and installed by the whole crane, which must have the cooperation of cranes in construction and have high requirements for the site.
The design of membrane structure mainly includes body shape design, initial equilibrium shape analysis, load analysis and shearing analysis. The body design is used to determine the building plane shape and size, three-dimensional shape, headroom volume, coordinates of each control point, structure type, and selection of suitable membrane materials and construction plan.
The basic function of the gas station canopy is to shelter personnel, vehicles and fuel dispensers from the wind and rain, and it is also an important part of the overall image of the gas station, and even the most important image recognition mark of the gas station.
The joint workshop of Xuchang cigarette factory is a comprehensive tobacco joint production plant consisting of more than thirty different functional rooms, such as formula elevated warehouse, silk making workshop, vacuum damp room, pre-matching cabinet room, etc.
The diversification of buildings requires solid and reliable technology in the connection of steel structures. Steel structure welding and strength bolt construction are the main methods of steel structure connection, with high efficiency and high performance. Good, safe and reliable, it has been widely used in construction with good results.
Due to the large single area and large span of the roof, and the steel space frame roof structure , there are many cranes running in the factory building , and the vibration is relatively large , so that the roof is in the process of elastic changes , and the design and construction of the roof waterproofing project are difficult.
marketing01@cnxzlf.com
+86-516-8595-0258
+86 17751936871