Your current browser version is too low, in order to bring you a better browsing effect, please use a higher version browser

Home Products Customize Tensile Membrane Structures For Outdoor Football Stadium Roof
Customize Tensile Membrane Structures For Outdoor Football Stadium Roof
Customize Tensile Membrane Structures For Outdoor Football Stadium Roof
Customize Tensile Membrane Structures For Outdoor Football Stadium Roof
Customize Tensile Membrane Structures For Outdoor Football Stadium Roof
Customize Tensile Membrane Structures For Outdoor Football Stadium Roof
Customize Tensile Membrane Structures For Outdoor Football Stadium Roof
Customize Tensile Membrane Structures For Outdoor Football Stadium Roof
Customize Tensile Membrane Structures For Outdoor Football Stadium Roof

Customize Tensile Membrane Structures For Outdoor Football Stadium Roof

1、The outdoor football stadium tensile membrane structures roof projected area of the stadium stand membrane structure is 72X23.5=1692m², and the unfolded area is 1800m². The stadium tensile membrane canopy structure consists of 9 conical membrane structural units.

2、The whole tensile membrane structure bleacher canopy is located on the concrete column of the grandstand. The main system of the structure is composed of 8 triangular space trusses with a spacing of 8 meters and a cantilever of 20 meters. , ensuring stability in the structural plane. Secondary trusses are arranged at the front end of each main truss and between the columns so that the entire structure forms a space stress system integrated with steel, cables and membranes. The safety and stability of the structure are well guaranteed.

Technical Advantages

Since the membrane structure stadium is designed as an open structure, when the membrane surface is subjected to wind load, it mainly bears the wind suction in the direction perpendicular to the roof. Because of the reaction force with the cantilevered concrete beam, a front cable is arranged at about 1/3 of the front end of the truss to bear most of the wind suction, making the structure more stable and safer.

membrane roof

Engineering construction

This football stadium project is divided into steel structure installation and membrane installation. In the process of steel structure roof installation, it should be considered that since the main truss cantilever reaches 20 meters, the rear tie rod plays an important role in the stability of the main truss, and it must be checked during installation. Whether the pull rod has entered the stress state. After the main truss is hoisted, since the cross-section of the truss is an inverted triangle, which is unstable outside the plane, the wind cable must be added to keep it stable, and the secondary truss must be installed quickly so that the whole structure becomes a space stress system to ensure the stability of the structure. Stable and secure.

Related Products

Message

If you have an inquiry or some feedback for us ,please fill out the form below to contact our team.